Geological investigation reports concerning earthquake areas have
stated that the ground fully complies with the regulations.
Construction of the complex will be performed under the control
of Manavgat Yapi Denetimi A.S. according to and in compliance with
the construction norm TS/EN ISO 9001: 2000, 15 years guarantee.
In the Complex:
The entrance and all walk ways will be paved. The park areas will
be grassed.
There will be a swimming pool constructed in the development of
75-80 square metres.
There will be swimming pool for children.
A shower will be provided near the swimming pool.
Non slippery floor in pool area.
The complex will have interior and exterior lighting.
All out door areas will planted with flowers and trees.
Car parking areas will be provided.
The Construction:
The construction will be steel reinforced concrete.
The walls will be constructed of bricks.
All walls will be doubled and insulated for noise control.
Each block will have a substructure sewer system.
The exterior walls will be plastered and painted high quality emulsion
paint.
The building's entrance floor and stairs will be marble.
A solar energy system will be supplied which is supported by an
electrical heating support system.
Covered balconies will be tiled with ceramic tiles and edged in
marble with the railings being constructed of ironwork.
The Roof Construction:
Insulation against humidity.
3-fold insulation against heat and cold.
Roof tiles will be fireproof, gutters set in concrete.
All drain pipes will be of plastic.
The roof will be underfaced.
Interior:
Four Air-conditioning units will be provided in the property one
in the living room, one in the master bedroom. You may choose the
location of the other two air conditioning units.
The inner walls will be plastered and painted with satin washable
paint
Decorative coving will be provided between the ceiling and the walls.
Tiles and Floor coverings:
First class ceramics will be used in the apartments. Our customers
will be able to select these if they purchase off plan.
Bathrooms are fully tiled from floor to ceiling.
Windows and Doors:
The front door will be a safety door constructed of steel. Interior
doors will be wooden American panel.
PVC double glazed windows with insulation are installed throughout.
Integerated shutters with fly screens
will be fitted to all windows.
Kitchen:
The kitchen units will be wooden MDF and painted. The Kitchen will
be fitted with a marble worktop.
The wall between the worktop and the cupboards will be tiled in
ceramic wall tiles.
Ventilation:
The bathrooms, toilets and storage rooms are fitted with a mechanically
operated ventilation system.
The bathroom will be fitted with designer bathroom furnishings.
All bathrooms will be fitted with a toilet.
General information:
Energy savers and smoke detectors will be fitted as standard.
Infrastructure for Broadband internet
connection will be provided.
White fittings and air conditioning units come with a 2 to 3 years
guarantee.
Integral safe boxes will be supplied.
Adequate electrical sockets will be fitted in all rooms including
terraces.
Telephone connections are provided in the salon and bedrooms.
A satellite dish and socket will be provided.
|